EAST SAN ANTONIO STREET: Every Saturday from 8 a.m. to 3 p.m. Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program, 512-393-8430.
THORPE LANE: The 1300 block of Thorpe Lane will be closed until March 31, from 7 a.m. to 6 p.m. for Construction - KBR Builders Inc.
FELTNER ALLEY: Feltner Alley will be closed March 26, from 8 a.m. to 6 p.m. for a manhole repair – Jay Edwards – 512-693-1342.
CONCHO STREET: Concho Street will be closed March 18 – 22, from 7 a.m. to 5 p.m. for Utility Installation – Joe Solis – Richmond Builders Inc - 956)-400-9986.
EAST SAN ANTONIO STREET: East San Antonio Street will be closed March 17, 2019, from 8 a.m. to 12 p.m. for the Annual St. Patrick’s Day Event – Brian Jeffrey – 512-392-7310.
HOPKINS STREET: Hopkins Street will be closed March 18-22, from 7 a.m. to 5 p.m. for Utility Installation – Justin Dorsett – 512-801-2907.
POSEY ROAD: Posey Road at I-35 will be closed nightly March 17-20, from 9 p.m. to 5 a.m. for Bridge Construction – James Webb – 512-565-8406.
LONG TERM ROAD PROJECTS:
CM ALLEN: One lane northbound in the 100 block of CM Allen will be closed starting until March 22, from 8 a.m. to 5 p.m. for Sidewalk Construction - Shawn Wolfshohl - 512-393-8019.
RAILROAD STREET: Railroad Street between Eisenhower and Gomez Street will be closed starting until March 31, from 7 a.m. to 5 p.m. for Utility Installation – Cox Commercial Construction – 956-601-1645.
PATTON STREET: Patton Street between Roosevelt and Wavell Street will be closed until March 31, from 7 a.m. to 5 p.m. for Utility Installation – Cox Commercial Construction – 956-601-1645.
MILL STREET RECONSTRUCTION: Mill Street between 500 and 700 blocks will have partial lane closure through the fall of 2019, for the reconstruction of waterline services and potholing. City of San Marcos Engineering/ CIP Dept. 512-393-8130; Smith Contracting – 512-789-5441.
CHEATHAM STREET: Cheatham Street and the 400-500 Blocks of Guadalupe will have partial lane closures through July for new construction. Gary Bellomy Cheatham Street, L.P. 512-694-8839.
SESSOM DRIVE: Sessom Drive from Aquarena Springs to ED J L Green will be closed until March 31, from 7 a.m. to 3 p.m. for Waterline Installation – PROTA Construction – Kermith Garcia – 512-535-2555.
ARMSTRONG STREET: The 100-400 blocks of Armstrong will have partial lane closures through March 31, from 7 a.m. to 5 p.m. for Utility Installation – Cox Commercial Construction – Darren – 956-601-1645.
HOPKINS STREET: Hopkins Street will be closed through the fall of 2020 for a Road Widening Project and Underground Utility Installation – Richard Reynosa - 512-393-8235.
ROOSEVELT STREET: Roosevelt Street from Eisenhower Street/Patton Street will have partial lane closures with flagger control starting March 1- 31, 2019, from 7 a.m. to 5 p.m. for Wastewater line construction – Cox Commercial Construction 956-601-1645.
CAMACHO STREET/MACARTHUR STREET: 200 – 300 Block of Camacho Street/MacArthur Street will have lane closure with flagger control March 18 – April 30, from 7 a.m. to 5 p.m. for Wastewater line construction – Cox Commercial Construction 956-601-1645.
ALABAMA STREET: 500-800 Block of Alabama Street will have lane closure with flagger control through March 31, from 7 a.m. to 5 p.m. for Wastewater line construction – Cox Commercial Construction 956-601-1645.
COERS STREET: Coers Street between Old RR 12 to Owens Street will have southbound lane closure to through traffic through April 30, from 7 a.m. to 5:30 p.m. for drainage improvement – Denbow Company – 512-264-2767.
NORTH BISHOP STREET: Westbound Bishop Street between Belvin Street and Prospect Street will be closed until March 30, from 7 a.m. to 6 p.m. for a New Sidewalk Installation – Winters Construction – Charlie Winters – 210-224-7920.
CM ALLEN: CM Allen between University Drive and Hopkins Street will be closed through April for the Reconstruction of the Roadway. City of San Marcos Engineering/ CIP Dept. 512-393-8130.
CONCHO STREET: Eastbound Concho Street between LBJ and Guadalupe will be closed, LBJ and Guadalupe will also have narrow lanes between University Drive and Concho Street, through the summer of 2020 for Construction. 3411 Builders, Inc. – Richard Bagby- 832-449-0328.
STUDENT CENTER DRIVE: Student Center Drive from Matthews to the North Loading Dock of the Alkek Library will be closed until Jan. 31, 2020 for the expansion of the LBJ Student Center. Service and delivery access to Alkek Library and Derrick Hall loading docks will be available, via Russell and Pickard Streets. Texas State University 512-245-2202.